• Contact Directory
  • Accessibility
  • Menu Item
City of South Bend Flag

South Bend, Indiana

Mayor James Mueller

  • 311 Service Portal
  • Residents
  • Departments
  • Elected Officials
  • Business
    • Welcome Home
    • Boards & Commissions
    • Find Support Programs
    • Build South Bend
    • City Events and Meetings
    • Info on Mayoral Initiatives
    • Transparency & Performance
    • Together South Bend
    • Guides to South Bend

Home » Departments and Divisions » Public Works » Engineering


Engineering

The Division of Engineering oversees the development, design, construction management and inspection for all public works and capital improvement projects. Engineering also manages the permits for construction in the public right-of-way and reviews plans and specifications for all potential new or redevelopment projects.

Municipal Separate Storm Sewer System (MS4) Program

Our Services

  • Report a Traffic Concern
  • Lamppost Lighting Program
  • General Bird Scooters Inquiry
  • Handicap Parking Space Signs
  • Residential Basement Valve Program

Engineering Forms & Permits

Consent to Annexation
For properties outside city limits wanting to connect to City Utilities

Erosion & Sediment Control Plan Application
For development of parcels where land disturbance is greater than or equal to one acre.

In-Lieu of Disconnect Commercial Property Application
Application for commercial properties who are unable to disconnect their downspouts from the City’s sanitary or combined sewer system

Right-of-Way Excavation Permit Request
Request authorization to excavate within the public right-of-way

Right-of-Way Long Term Occupancy Application
For activities that will require the long-term closure of the public right-of-way

Residential Backflow Valve Program

Report a Stormwater Concern
Residents can report any dumping or illicit discharges made near or into a storm drain, stream, ditch or lake within city limits.

Sewer Lateral Reimbursement Program
Assists property owners with the complete replacement or lining of a sewer lateral from the house to the City’s main sewer line. The program only applies to new residential infill construction.

Sewer Tap Permit Request
To be used for new taps into the sewer system.

Traffic Control and Occupancy Request

Traffic Concern Form
For any issues with traffic flow, signage, speeding, etc.

Trucking and Oversize Loads Permit
One-time permit for trucking of oversized loads within the city limits

Annual Trucking and Oversize Loads Permit
Annual permit for trucking oversized loads within the city limits

Utility Verification Form
For any new connections to the City utility system (water and sewer)

Schedule of Engineering Permit Fees

Permitting and Engineering Review Fees
Checks made payable to City of South Bend


Design & Construction Standards & Prevailing Specifications for Public Works

These approved Design & Construction Standards and the Prevailing & Supplemental Specifications must be followed for any construction activity in the city.

These standards and specifications have been prepared to establish consistent design elements and requirements for developers, contractors, utilities and other private parties as well as for providing guidance for work within or affecting the City’s right-of-way. The standards and specifications were approved by the Board of Public Works at the regular meeting on June 26, 2018.

Right-of-way Standards

Per Municipal Code – Chapter 18, Article 7, no contractor or subcontractor shall perform any work affecting the right-of-way, any City-owned utility system, or any other work or occupancy in the City right-of-way, whether or not the work is performed for the City, without first obtaining a BOND with the Department of Public Works for occupancy, excavation or sidewalk/street construction before commencing any work. Contact the Permit Office at 574.235.9254 for the appropriate bond form.

Any use, restriction or excavation of the City Right-of-Way, such as streets, alleys and sidewalk areas, requires a permit by the bonded contractor. Permits are required prior to excavations, construction or occupancy that exceeds typical use in the Right-of-Way. Traffic control is required for any work that restricts, redirects or impedes travel in the Right-of-Way. Refer to MUTCD for traffic control guidelines and map examples to submit with your occupancy requests.  Refer to the Municipal Code for right-of-way occupancy guidelines.

Site Development Guidance

Developments within the City are required to conform to the Design & Construction Standards, Zoning Ordinance and Municipal Code. A Site Development Guide is available for developers to provide an overview of these requirements. Developers may contact SiteDevelopment@southbendin.gov for additional information.

New Construction and System Development Charges

For any new construction connecting to the City’s Municipal Water and Sewer Works, System Development Charges (SDCs) will be collected at the time when an application for service is filed. The Utility Verification Form shall be completed and signed by the owner of the property. Refer to the Code of Ordinance for a full explanation of SDCs. For more information, contact the Permit Office at 574.235.9254.

Small Cell Standards

View the COSB Small Cell Standards for guidance on installing small cell wireless infrastructure on City owned infrastructure or within City right-of-way.

This web page was last updated on February 12, 2026. Links to other resources on this web page may have been last updated on a different date.

How was your experience?

Connect

South Bend City Hall
215 S. Dr. Martin Luther King Jr. Blvd
South Bend, IN 46601

Get Directions

Dial 311
Phone: 574-233-0311Call 574-233-0311
TTY: 574-235-5567

My Government

  • 311 City Services
  • Contact a Department
  • Together South Bend

311 Service Portal

Take Action
  • Apply
  • 311 Knowledge Center
  • Pay
  • Report
  • Request
Service
  • Animals
  • Business
  • Elected Officials & City Administration
  • Events & Recreation
  • Housing, Property, & Building
  • Parks & Trees
  • Public Safety
  • Streets, Sidewalks, & Transportation
  • Sustainability
  • Utilities & Trash
Privacy Policy | Terms of Use | ADA | Title VI
© 2026 City of South Bend, Indiana

    Mobile Navigation Menu

    • 311 Service Portal
    • Residents
    • Departments
    • Elected Officials
    • Explore More
      • Welcome Home
      • Boards & Commissions
      • Supporting South Bend
      • Build South Bend
      • City Events and Meetings
      • Info on Mayoral Initiatives
      • Transparency & Performance
      • Together South Bend
      • Guides to South Bend
      • Contact Directory
      • Accessibility
  • This field is for validation purposes and should be left unchanged.
  • This feedback form is only to report issues with the City of South Bend's website. Dial 311 to make a department-specific request or report an issue unrelated to the City's website.
    We cannot guarantee a response to every message that comes in, but will try our best to answer any website-related questions
    You may view the policy at https://southbendin.gov/city-of-south-bend-data-collection-policy/